top of page
Anchor 1

Zonnebloem Playground Co-design

​

See Saw Do has been part of a larger ongoing project on the Zonnebloem College Estate. Focussed on placemaking on the playground, we have run various interventions, workshops and prototypes with the students. 

​

Client : Thursday Projects (V&A Waterfront Museum Night)

Where : V&A Watershed

Concept, design and implementation : See Saw Do

Zonnebloem Multi Court Design.jpg

Getting to know the Playground

play-map.gif
Research and Observation

 

We started by spending time on the playground, observing the types of play, running focus groups, surveys and short workshops. This helped us get a better understanding of the resources available, the culture of play that exists and how the students engage with their existing space. We then began to ask what the students imagine their space can become.

​

Screen Shot 2018-10-17 at 13.33.32.png
Screen Shot 2018-10-17 at 13.35.51.png
Screen Shot 2018-10-17 at 14.56.53.png
Screen Shot 2019-07-04 at 14.37.25.png

First Playground Intervention

Play Barn Build

 

The Play Barn is a space filled with prototyping tools and materials and a meeting space to share content with the kidZ of Zonnebloem as we partnered with them to redesign their playground.

 

To build the Play Barn we invited the students of Zonnebloem to get hands-on and be a part of the process. There was much excitement and we were amazed at how quickly these young doers got stuck in. These cool kidZ were full of energy, ready to paint, saw and build the new space for their school.

 

A big thanks goes out to Design Indaba and Morag Myerscough who donated the beautifully coloured plywood boards that were repurposed to build the Play Barn structure. Checkout the article on Design Indaba's website.

​

Build concept.jpg
IMG_20180315_162054.jpg
IMG_20180315_112257.jpg
IMG_20180319_160617.jpg
IMG_20180320_164125.jpg
IMG_20180319_153952.jpg
IMG_20180319_164839.jpg
Open.gif
IMG_20180316_160117.jpg
Goals.gif
IMG_20180322_135220.jpg
IMG_20180322_140717.jpg
IMG_20180323_154242 copy.jpg
Testing Loose Part Play

 

What will happen if you give children access to loose parts, tools and materials on the playground? We Opened up the Play Barn for free play. Here is a short clip which shows the magic of letting young makers do their own thing✌

​

Why Consider Loose Part Play?

 

"Loose parts aren’t prescriptive and offer limitless possibilities. A stick, for example, may become a fishing rod near real or imaginary water, a spurtle in a mud kitchen, a tool to nudge a football that is stuck in a tree; it can be thrown, floated, snapped, pinged, bent, hidden, added to a pile, burnt, tied to something else, split, catapulted or discarded. Static, unchanging play spaces do little for children whereas environments which can be manipulated, where things move and can be moved open worlds of possibility.

 

At a beach, for example, there is an abundance of water, sand, stones, rocks, smells, sights, vistas and textures which enable children to be highly inventive and creative in their play.

 

Natural environments such as mature woodland or beaches often provide significantly more loose parts with higher levels of affordance than many artificial play spaces such an asphalt school playground or a tidy urban park." (Loose Parts Play : A toolkit by T Casey & J Robertson)

​

Rolling-on-cardboard.gif
IMG_20180323_153651.jpg
IMG_20180326_155639.jpg
IMG_20180327_134449.jpg

Prototyping Playground Games

Cardboard Games Day

 

On the last day of school, we hosted a games day to test all of our prototypes in one go. The games were placed in different areas of the playground. These prototypes would inform the design of longer lasting infrastructure for this area of the playground. By inviting the students to build and test ideas, we opened up opportunities to get hands-on and shape their own environment, forming better connections between the community and their space.

​

IMG_20180328_075755_1.jpg
IMG_20180322_153026.jpg
IMG_20180322_144947.jpg
IMG_20180320_155123.jpg
IMG_20180328_090644_1.jpg
Screen Shot 2018-10-17 at 13.35.57.png
Screen Shot 2018-10-17 at 13.35.41.png
IMG_20180328_092432.jpg

Implementing Floor Games

Zonnebloem Multi Court Design.jpg
IMG_6323.jpg
painting.jpg
IMG_6853.jpg
IMG_6304.jpg
IMG_6600.jpg
IMG_6763.jpg
IMG_8263.jpg
bottom of page